$5.00 USD One payment for this slide. No subscription, no bundle.
Buy Now
  1. 1Name and email
  2. 2Pay with PayPal
  3. 3Download
  • Download page opens the moment payment clears
  • Same link emailed, with a PDF receipt
  • 10 downloads included, reactivation on request
Format
Microsoft PowerPoint (.pptx), 16:9
Built from
Native shapes, not a flat picture
Editing
Recolour, resize and retype everything
Works with
PowerPoint 2010+, Windows and Mac
Not designed for
Google Slides or Apple Keynote
Licence
Single user, unlimited client work

Critical Path Slides

Critical Path Slide, Monochrome

Editable critical path slide for PowerPoint in a single-colour treatment for print and greyscale packs.

Editable critical path slide for PowerPoint in a single-colour treatment for print and greyscale packs. Every element is a native PowerPoint shape rather than a flat picture, so you can recolour it to your brand, resize it without any loss of quality, and retype every label in seconds. One-page layouts that carry the answer, the evidence and the ask. Built for project and programme work. Drop it straight into a client deck, board pack, investor update or internal review. Supplied as a single .pptx sized 16:9, built for Microsoft PowerPoint 2010 and higher on Windows and Mac. It is a PowerPoint file and is not designed for Google Slides or Apple Keynote.

What this slide is for

  • powerpoint slide
  • editable slide
  • presentation template
  • pptx template
  • editable powerpoint
  • single slide download
  • instant download slide
  • 16:9 widescreen slide
  • native powerpoint shapes
  • fully editable vector slide
  • critical path slides
  • critical path slide
  • project and programme
  • critical path slides powerpoint
  • critical path slides slide template
  • critical path slides template
  • critical path slides ppt
  • editable critical path slide
  • critical path slide for powerpoint
  • critical path slide template download
  • critical path powerpoint template
  • critical path diagram slide
  • critical path ppt slide
  • monochrome slide
  • greyscale slide
  • black and white slide
  • print friendly slide
  • consulting deck slide
  • management consulting template
  • investment banking slide
  • board presentation slide
  • investor pitch slide
  • corporate presentation template
  • business review slide
  • mckinsey style slide