$5.00 USD One payment for this slide. No subscription, no bundle.
Buy Now
  1. 1Name and email
  2. 2Pay with PayPal
  3. 3Download
  • Download page opens the moment payment clears
  • Same link emailed, with a PDF receipt
  • 10 downloads included, reactivation on request
Format
Microsoft PowerPoint (.pptx), 16:9
Built from
Native shapes, not a flat picture
Editing
Recolour, resize and retype everything
Works with
PowerPoint 2010+, Windows and Mac
Not designed for
Google Slides or Apple Keynote
Licence
Single user, unlimited client work

Risk Registers

Risk Register Slide, Monochrome

Editable risk register slide for PowerPoint in a single-colour treatment for print and greyscale packs.

Editable risk register slide for PowerPoint in a single-colour treatment for print and greyscale packs. Every element is a native PowerPoint shape rather than a flat picture, so you can recolour it to your brand, resize it without any loss of quality, and retype every label in seconds. Dense tables that stay readable, with banded rows and aligned figures. Built for project and programme work. Drop it straight into a client deck, board pack, investor update or internal review. Supplied as a single .pptx sized 16:9, built for Microsoft PowerPoint 2010 and higher on Windows and Mac. It is a PowerPoint file and is not designed for Google Slides or Apple Keynote.

What this slide is for

  • powerpoint slide
  • editable slide
  • presentation template
  • pptx template
  • editable powerpoint
  • single slide download
  • instant download slide
  • 16:9 widescreen slide
  • native powerpoint shapes
  • fully editable vector slide
  • risk registers
  • risk register slide
  • project and programme
  • risk registers powerpoint
  • risk registers slide template
  • risk registers template
  • risk registers ppt
  • editable risk register slide
  • risk register slide for powerpoint
  • risk register slide template download
  • risk register powerpoint template
  • risk register diagram slide
  • risk register ppt slide
  • monochrome slide
  • greyscale slide
  • black and white slide
  • print friendly slide
  • consulting deck slide
  • management consulting template
  • investment banking slide
  • board presentation slide
  • investor pitch slide
  • corporate presentation template
  • business review slide
  • mckinsey style slide